Laserfiche WebLink
<br />ROADABLE EQUIPMENT <br />Machine <br />Descriptlon >: <br /> <br />Total <br />osUhbur/unit - <br /> <br />Fleet Size Haul Trip <br />(No. units) CosUhr/fleet ,: <br /> <br />Retum Trip <br />Cost/hr/fleet <br />sheet 2 of 2 <br />-Fuel Tanker, 4x2, 170 HP $44.52 7 $44.52 $44.52 <br />-Flatbed Truck, 4x2, 30K GVW $66.39 1 $66.39 $66.39 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: Sf10.90 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Transportation Cycle Time : Non- Total one-way travel distance : <br />Roadabie Roadabie Average travel speed : <br />Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost' : <br />Retum time (hours) = 1.00 1.00 • two rourq trips wiM haul rip <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : <br />Unloading time (hours) = 0.50 NA •• one round hip, ra naui rip <br />Subtotals = 3.00 2.00 <br />,: <br />JOB TIME AND COST Total job time : <br />Total job cost : $110.90 <br /> <br />Delta <br />40.0 <br />40.0 <br /> <br />$3,828.31 <br /> <br />$221.81 <br /> <br /> <br /> <br />.00 <br />$4.050 <br /> <br /> <br />iles <br />mph <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />urs <br />