Laserfiche WebLink
CIRCES Cost Estimatinstl Software <br />Pernik or other job action :2006 Midterm Review <br />Task description :Mobilize/Demobilize Equipment for Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 MP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour: $23.32 $25.78 $31.45 <br /> Operatingcost/hour: $30.29 $31.74 $35.14 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> Helper costlhour : $0.00 $25.15 $25.15 <br /> Total Unit Cost/hour: $81.01 $60.07 $119.13 <br />Machine <br />Description Weight/unit <br />(tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhdunit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/8eet Retum Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Cat D9R - 9SU 66.73 $51.01 $119.13 1 $170.14 $119.13 $0.00 <br />-CAT 815E 22.97 $47.73 $81.01 1 $128.74 $81.01 $0.00 <br />-Cat621G 35.55 $37.06 $110.07 1 $147.13 $110.07 $0.00 <br />-CAT 14H 20.70 $34.94 $81.01 1 $115.95 $81.01 $0.00 <br />-RevegEquipment 20.Ob $78.00 $81.01 1 $159.01 $81.01 $0.00 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 018 State :Colorado Perm~ob # : C-1983-059 <br />Date :02222006 County :Delta Abbreviation :none <br />User : JRS Site :Terror Creek Loadout Filename : C059-018 <br />