Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # : 025 <br />Date : 0927/2006 <br />User : TAK <br />State :Colorado <br />Permit/job # : C-80-007 <br />County :Gunnison <br />Site :West Elk Mine <br />Abbreviation :none <br />Filename :0007-025 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description <br />HOURLY EQUIPMENT COST <br />Access Road from <br />Machine description :Cat 330C L <br />Gulch Road to Office <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $46.31 NA Shift basis : 1 perday <br />Operating cosUhour : $58.15 100 Data source : (CRG) <br />Operator cosUhour : $32.96 NA <br />Total unit cosVhour : $137.42 Total fleet cosf/hour : $137.42 <br />_,. <br />MATERIAL QUANTITIES .. , <br />Initial Swell Loose <br />volume : 4,209 CCY factor : 1.165 volume : 4,903 LCY <br /> <br />Source of estimated volume :Map 53 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing emoril <br /> Basicjob condition description : BELOWAVERAGE <br />Secondary job condition within basic description : SEVERE <br /> Cycle time value : 0.39 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2,25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,300 feet Altitude adjustment : 1.00 I (Cat HBJ <br /> Job efficiency adjustment : 0.83 (1 shiff/day) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 294.23 LCY/hour <br />Adjusted hourly unit production : 244.21 LCY/hour <br />Adjusted hourly fleet production : 244.21 LCY/hour <br />>: <br />;; <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 20.08 hours <br />Unit cost : $0.563 per LCY Total job cost : $2,759 <br />