My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # ; 024 <br />Date ; 09!27/2006 <br />User ; TAK <br />Permivjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-024 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Re_grade ramp from Hwv 133 to Loadout <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Machine description :Cat 330C L <br />Ownership cost/hour <br />Operating cost/hour <br />Operator cost/hour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 540 CCY <br />Utilization <br />Swell <br />factor: 1.165 <br />$46.31 NA <br />$58.15 100 <br />$32.96 NA <br />$137.42 <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Shift basis : 1 perday <br />Data source : {CRG) <br />Total fleet cosUhour : $137.42 <br />Loose <br />volume : 629 LCY <br />Source of estimated volume :Map 53 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket. swing em <br /> Basic job condition description : BELOW AVERAGE <br /> Secondary job condition within basic description : SEVERE <br /> Cycle time value : 0.39 minutes <br />Buckek Caoacitv <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill faIXor ; 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,300 feet Altitude adjustment : 1.00 ~ (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shifUday) <br /> Netjob correction : 0.83 multiplier <br />Unadjustetl hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.563 per LCY <br />294.23 LCY/hour <br />244.21 LCY/hour <br />244.21 LCY/hour <br />Total job time : 2.58 hours <br />Total job cost : $354 <br />
The URL can be used to link to this page
Your browser does not support the video tag.