Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :Colorado Division O1 Reclamation, Mining Arrd Safety <br />Task # : 011 State :Colorado PermiUjob # : C-80-007 <br />Date: 08/09/2006 County:Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-011 <br />Permit or other job action :Permit Renewal RN-O5 <br />Task description :Haul remaining coal material at loadout to refuse pile <br />:: .. _.: .. .. .., ~ .~:i a <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Trucklloader team -Truck <br />-Loader: <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />lenc f0-12 t <br />r 966G (20( <br />D9R-9SU <br />D9R-9SU <br />6z4 <br />Cost Breakdown : Truck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />%Utilization-machine: 100 97 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cosUhour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cest/hour: $41.22 $37.00 $98.84 $98.84 NA NA <br />Ripper op. cesUhour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals : $74.83 $99.53 $196.34 $196.34 NA NA <br />Number of units : 5 1 1 1 0 0 <br />Group subtotals: Work: $473.66 Support: $392.68 Maintenance: $0.00 <br />Tolal work team cosUhour : $868.34 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 2, 728 LCY factor : NA <br />Loose <br />volume: 2,728 LCY <br />Source of quantity take-off :Map 53 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cest : $0.00 /LCY Total cost : $0 <br />_.. <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 1,600 poundslLCY Struck volume : 10.00 LCY <br />Descr.: Coal -Bituminous, Raw Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 22.12 LCY Adjusted volume': 12.00 LCY <br />Final truck volume based on number of loader passes : 8.55 LCY <br />' WGC volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.:Other- soil, boulders, roots (80 -100%) Altitude adj.: 1.000 0.920 (Caf HB) <br />Bucket fill factor : 0.900 Job effciency : 0.830 0.830 (1 shifUday) <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 0.764 <br />