Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 08/312006 <br />User : TAK <br />Agency or organization name <br />Permit or other job action <br />Task description <br />~------ - <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cost hour <br />Total unit cosUhour <br />Utilization <br />$72.92 NA <br />_ <br />$98.84 100 <br />_ <br />$0.00 ____ <br />0 <br />$32.78 NA <br />$204.53 Total fleet cosVhour : $818.13 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,099 CCY factor : 1.165 volume <br />2,445 LCY <br />Source of estimated volume :Permit Volume7,_Exhibit 43 <br />Source of estimated swell factor :CAT Handbook <br />L -- ------ -- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted ill or embankment <br />Average push gradient : 8.00 % (pos) <br />Average site altitude : 6,300 feet ' <br />Material weight : 2,900 1bs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : _ _ 0.75 _ (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshilUday) <br />Spoil pile : 0.80 (fnd-riJ <br />Push gradient : 0.83 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 ~ (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.30 <br />Adjusted unit production <br />Adjusted fleet production <br />625.50 LCV/hr <br />2,501.98 LCY/hr <br />----- <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.98 Hours <br />r Unit cost : $0.327 /LCY Total job cost : $800 <br />l_ ~ --~-- --~ <br />State :Colorado PermiUjob# <br />County :Gunnison Abbreviation <br />Site :West Elk Mine Filename <br />C-80.007 <br />none <br />0007-010 <br />Colorado Division Of Mining, Reclamation And Safety <br />Pemtit Renewal RN-OS _ <br />Bac~ll Sylvester Gulch fan pad <br />