Laserfiche WebLink
L; <br />Preliminary Adequacy Review <br />Bear Coal Co:, Znc. - Bear Mine <br />May I5, 1981 <br />2.03 Legal, Financial, Compliance Information <br />1. The name, address and position of each consultant used in obtaining information <br />relating to soils, geology, vegetation, and air and water qua.Iity must be provided. <br />PAGES SA & s <br />2. The application form indicates that. surface land ownership is federal.,. but, <br />on page 9 of the narrative, it is stated that U.S. Steel and ARCO are the surface <br />owners. This should be clarified. PAGE 9 <br />3. The applicant should clarify the holders of record of; leasehold interests., <br />Tl~e application currently states that surface owners are also Ie~~asehFFolders. <br />4. The applicant should specify ownership of coal eonbiquous toA~~ie:9coal to be <br />mined. Is it all federal coal? <br />I PAGE 9 <br />5. It is stated. on page 9 under 2.03.9(c) that there are no owners of record of <br />leasehold interests of the coal to be mined. The applicant should clarify: that <br />the coal to be mined is under contract to the Atlantic Richfield Company., The <br />applicant should also provide verification.that a contract has been obtained between.. <br />ARCO and Bear Coal Company. The extent of leased coal and. the dates of termination <br />~ °f the lease must be proviaea. FIGURE 2,03,4(ll (.e)-1~ E, 2~ PAGE 9 <br />,~ The applicant states on page 11 that Bear Coal Company has not operated a <br />~ surface coal mining operation in the previous five years. This is incorrect.. Bear <br />is currently operating under existing permit N77-241. To clarify the meaning of <br />-surface coal mining operations see Section 1.04 (132) of the Regulations.. This <br />3efinition of surface coal mining operations includes those surface operations and <br />surface impacts incident to an underground coal mine. <br />PP:GE 11 <br />7. The applicant must provide a revised List of the names of officers and directors <br />of ARCO, their titles and the divisions of Atlantic Richfield Company referenced on <br />pages 9 and 12. <br />PAGES 11.E 12 <br />l S. The applicant should indicate the current status of violation 2 on page i5. <br />f 9. The a licant should PAGE 15 <br />pp provide information on the vertical extent of mine workings <br />as required by 2.03.8. Also, the operation plan map should indicate the annual pro- <br />gression of mine workings. prAP 2,05,2(1)-1 P,4GE 20 <br />10. The applicant has stated that a new insurance certificate will be issued naming <br />the Division as the certificate holder and that.,the Division will be notified of <br />.~rry changes in the policy. This new certificate must be received beforQ permit <br />appr°val. FIGURE 2,03.9(1)-7.' <br />~~ The applicant should discuss whether or not final approval has been given by <br />on Che roof control plan. Also, it shoulal be indicated whether Bear Coal Co. <br />is valid NPDES and Air Quality Emissions permits. Copies of these permits should <br />#supplied. PAGES 21 Q: 22 <br /> <br />