My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100875
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:24 PM
Creation date
11/24/2007 7:25:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/15/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR66
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 232 <br />Date : 05/092006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :Minor Revision 66 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper op. cost hour <br />Operator cost/hour <br />Total unit cosUhour <br />PermiUjob# : C•1996-083 <br />Abbreviation :none <br />Filename : C083-232 <br />to MR-66 Disturbance Area <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank wooer <br />volume : 2,900 BCY <br />Swell <br />factor <br />Utilization <br />Loose <br />1.230 volume: 3,567 LCV <br />$56.94 NA <br />$104.98 100 <br />$0.00 0 <br />$32.53 NA <br />$194.45 Total Fleei cost hour <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,200 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Earth -Loam <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.509 /LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat H6 <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shifUda <br />Spoil pile : 0.80 (fnd-rfJ <br />Push gradient : 1.00 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 1.10 (Cat HB <br />Blade type : 1.00 (S/SU/lr <br />Net correction : 0.55 <br /> <br />Adjusted unit production : 381.66 LCY/hr <br />Adjusted fleet production : 381.66 LCY/hr <br />Total job time : 9.34 Hours <br />Total job cost : $1,817 <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />$194.45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.