My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100875
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:24 PM
Creation date
11/24/2007 7:25:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/15/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR66
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinta Software <br />PROJECT IDENTIFICATION <br />Task # : 231 <br />Date: 05/09/2006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And Geologl <br />Permit or other job action :Minor Revision 66 <br />Task description :Regrade Mr-66 Disturbance Area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower : 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br />OperatingcosUhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost hour : $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet wsUhour : $194.45 <br /> <br />,: _> <br />MATERIAL QUANTITIES ,: <br />Initial Swell Loose <br />volume : 10,000 BCY factor : 1.250 volume : 12,500 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 175 feet <br />Unadjusted hourly production : 805.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % ({ <br />Average site altitude : 6,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : 30.621 /LCY <br />Permitfjob# : C-1996-083 <br />Abbreviation :none <br />Filename : C083-231 <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Adjusted unit production : 313.15 LCY/hr <br />Adjusted Fleet production : 313.15 LCY/hr <br />Total job time : 39.92 Hours <br />Total job cost : $7,762 <br />
The URL can be used to link to this page
Your browser does not support the video tag.