My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100821
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:22 PM
Creation date
11/24/2007 7:22:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977526
IBM Index Class Name
Permit File
Doc Name
A REPORT FOR THE KILGORE GRAVEL MINING PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•=... <br />.^ <br />The grass mixture for the drier areas is that of: <br />Smooth Brome - <br />Western Wheat Grass - <br />Intermediate Wheat Grass - <br />Tall Wheat Grass - <br />TOTAL - <br />(Pure Live Seed/Acre) <br />2.0 pounds per acre <br />3.0 pounds per acre <br />3.0 pounds per acre <br />3_0 pounds per acre <br />11.0 pounds per acre <br />This is also doubled if the broadcasting method is used. <br />Over the reclaimed area groups of Willow, Black Cottenwood and. <br />Elm will be planted in groups of three to five. Eight groups per <br />acre will be planted. The Black Cottenwood and the Elm will be <br />calibrated trees from 1 1/2" to 2 1/2" in size. The Willows will <br />be root bound before planting. <br />Over the entire mining project there will be approximately 15 <br />acres of disturbed land; 3 acres of major disturbance and 12 <br />acres of moderate to minor disturbance. Reclamation costs are <br />estimated at $800 per acre on the major disturbance areas and <br />$325 per acre on the moderate and minor disturbance areas. <br />In other words, the total cost of reclamation would be estimated <br />as follows: <br />3 Acres @ $800/acre - $ 2,400.00 <br />12 Acres @ $325/acre - 3,900.00 <br />TOTAL BOND - $ 6,300.00 <br />Some reclamation has already been started on various parts of the <br />mining. The major disturbance areas on some parts have already <br />been sloped to the 3 to 1 slope that is stated on our plans. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.