Laserfiche WebLink
CIRCES Cost Estimatino Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State : Colorado Permiujob# : M-2006-009 <br />Date : 03/23/2006 County : Montezuma Abbreviation :none <br />User : WHE Site : Nindmarsh Sandstone Filename :M009-004 <br />Agency or organization name :DMG <br />Permit or other job action :112c a, <br />Task description :Rlp & <br />HOURLY EQUIPMENT COST <br />i review <br />3 acres, replace soil 2 foot <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.63 NA <br /> OperatingcosUhour : $104.98 100 <br /> Ripper op. cost/hour : $6.21 50 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $201.36 Total fleet cosUhour : $201.36 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,680 LCY factor : NA volume : 9,680 LCY <br /> <br />Source of estimated volume :(3ac)(43560sf/ac)(2'D) / 27 = 9680 cy <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill: 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Ca[ Hl3) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (>shiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 650 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Horsepower: 405 <br />