My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100742
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:19 PM
Creation date
11/24/2007 7:19:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006009
IBM Index Class Name
Permit File
Doc Date
3/23/2006
Doc Name
Adequacy Issues
From
DMG kap
To
Geological Services
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION ~ ~~ <br />Task # <br />Date <br />User <br />003 State :Colorado <br />03/23/2006 County:Montezuma <br />WHE Site :Hindmarsh Sandstone <br />Agency or organization name :DMG <br />Permit or other job action : 112c application review <br />Task description :Construct 3' earthen berm <br />HOURLY EQUIPMENT COST <br />Machine description :Gat 325C L <br />Of <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $33.26 NA Shift basis : 1 per day <br />Operating cosUhour : $42.57 100 Data source : (CRG) <br />Operator cosUhour : $32.72 NA <br />Total unit cosUhour : $108.55 Total fleet cost/hour : $108.55 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 LCY factor : NA volume : 2,000 LCY <br />Source of estimated volume : (((3'H x 18'W} / 2} x 2000'L) / 27 = 2000 cy <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empt <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.68 Rack -Well blasted (60% - 75%) <br />Adjusted bucket capacity : 1.10 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,500 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 225.31 LCY/hour <br />Adjusted hourly unit production : 187.00 LCYlhour <br />Adjusted hourly fleet production : 187.00 LCYlhour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 10.69 hours <br />Unit cost : $0.580 per LCY Total job cost : $1,161 <br />Permitfjab # :M-200ff-009 <br />Abbreviation :none <br />Filename : M009-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.