My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100695
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:18 PM
Creation date
11/24/2007 7:17:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004061
IBM Index Class Name
Permit File
Doc Date
11/3/2004
Doc Name
Adequacy Review
From
DMG
To
Environment Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 6.4.7 Exhibit G -Water Information <br />6. The Mining Plan states that an isolation ditch will be placed along the up gradient sides of the mine to route any offsite <br />surface flows around the disturbed azea. Please supply the Division with the dimensions of the proposed isolation ditch; <br />the expected flows through the ditch during a 100-yeaz storm event; and depict the ditch on the Mining Plan Map. <br />7. The Mining Plan states that drainage will be maintained to the southeast, where runoff form precipitation will be <br />captured in a holding pond and released once sediment has been removed. Please depict the holding pond on [he Mining <br />Plan Map. <br />Rule 6.5 Geotechnical Stability Exhibit <br />8. Please be awaze that Division staff is reviewing the Geotechnical Stability Exhibit separately, and adequacy questions <br />regazding this exhibit maybe addressed at a later time. <br />Please be advised that the Linke Construction, Inc., Cottonwood Quarry, 112(c) Permit Application may be deemed <br />inadequate, and the application may be denied on December 16, 2004 unless fire above mentioned adequacy review items aze <br />addressed to the satisfaction of the Division in a timely manner allowing for adequate time to review the responses. If you <br />feel more time is needed to complete your reply, the Division can grant an extension to the recommendation date. Phis will <br />be done upon receipt of a written waiver of your right to a recommendation by December 16, 2004 and request for additional <br />time. This must be received no later than the deadline date. <br />If you have any questions, please do not hesitate to call me at (303) 866-4935. <br />Sincerely, <br />~~~~ <br />Kate Pickford ~ <br />Environmental Protection Specialist <br />i <br />cc: Cazl Mount; DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.