Laserfiche WebLink
Fine reject material will be brought back to the active pit from the processing azea for backfilling <br />on the slopes. Grading will be done by dozers or other equipment which will compact and stabilize <br />the overburden and naturals in their fmal configuration. Selective handling or placement of over- <br />burden materials will not be necessary. <br />The earth perimeter berm azound the permit azea will remain to provide extra protection against the <br />100 yeaz flood from entering the pit lake. The entire lake will be outside the 100 year floodplain of <br />the Colorado River. <br />Gilsonite Pit 9/03 27 <br />