2 <br />• 2.05 <br />Minimum Requirements for Operation and Reclamation Plans <br />2.05.2 Operation Plan - Estimated Area for Life of Operation <br />2.05.2(2) <br />WF must attempt to describe future progress for the life of the operation. <br />The Division realizes such information is only a rough approximation, but as <br />the BLM lease 1130168 extends to the northeast of the desired permit area into <br />Sec. 3, WF must provide information on projected operations in this area and <br />a map showing probable areas of disturbance by phases. <br />2.05.3 Operation Plan - Permit Area <br />2.05.3(3)(b)(i)(C) <br />We should provide the approximate date of crusher construction. <br />2.05.3(3)(c) <br />WF must provide specifications of each road including overall grades, pitch <br />grades, and all other information required by Sec. 2.05.3(3)(c)(i). <br />?~SiS~ As per the request to accept the culvert installation in Bush Draw, this will <br />~,°~''~ ~ be acceptable to the Division provided all information required by Sec. 4.03.1 <br />~•'°'""' ~ (1)(e) are provided and show the installation shall remain stable. <br /> <br />ij , WF has failed to provide details of the diversion and collection system existing <br />- in the Pit 111 operations area All ditches other than Diversion Ditch D have <br />no design information provided. No design information is provided for Pond 2 <br />and Pond 3.) ~A31 information on the sediment control system for Pit 111 required <br />under Section 4.05 must be submitted. <br />2.05.3(6)(b) <br />WF must submit justification of all reclamation cost figures. Contractor costs- <br />and Cat Book costs are acceptable, but costs based on Wyoming Fuels equipment <br />and Operators are noC, as should WF default the costs incurred by the state - <br />would more approximate those of a contractor. Estimated costs for road and <br />sediment pond reclamation should be detailed as to volume of materials to be <br />moved, areas to be mulched, seeded, etc. Equipment used in eael~ phase of <br />reclamation should be specified and the time and distanced traveled should be <br />given to verify costs. Operator wages must be included in reclamation cost <br />estimates. WF should include fence replacement costs in their reclamation cost <br />estimate. <br />2.05.4 Reclamation <br />/ 2.05.4(2)(e)(VII) <br />Please provide a soil testing program for the evaluation of topsoil storage and <br />