Laserfiche WebLink
RECLAMATION COST ESTIMATE <br />• <br />MINE N0. 1 PORTALS, SHOP, OFFICE AND bJAREHOUSE FACILITIES <br />BACKFILLING <br />$ 2,874.71 <br />D8K dozer <br />Total volume = 7111 LCY <br />Productivity = 672 LCY/Hr. <br />Cost Calculation = 7111 LCY 672 LCY/Hr. x $65.84/Hr. _ $696.71 <br />Sealing of Entries: <br />Average cost for sealing of entry = $726.00/entry <br />Cost Calculation = 3 entries x $726/Entry = $2,178.00 <br />GRADING $ 188.66 <br />12G motor grader <br />• Total area = 7.48 Ac. <br />Productivity = 1.22 Ac./H r. <br />Cost Calculation = 7.48 Ac. 1.22 Ac./Hr. x $30.77/Hr. <br />RIPPING THE REGRADED SURFACE $ 188.66 <br />12G motor grader <br />Total area = 7.48 Ac. <br />Productivity = 1.22 Ac./Hr. <br />Cost Calculation = 7.48 Ac. 1.22 Ac./H r. x $30.77/Hr. <br />TOPSOIL REPLACEMENT <br />• <br />5 1,097.78 <br />6216 scraper <br />Total topsoil volume = 6034 Cu. Yd. <br />Productivity = 383 BCY/H r. <br />Cost Calculation = 6034 BCY 383 BCY/Hr. x $69.68/Hr. <br />