Laserfiche WebLink
TOPSOIL REPLACEMENT $ 362.38 <br />• <br />621B scraper <br />Total topsoil volume = 1815 BCY <br />Productivity = 349 BCY/H r. <br />Cost Calculation = 1815 BCY _ 349 BCY/Hr. x $69.68/Hr. <br />SEEDBED PREPARATION $ 37.13 <br />Total area = 2.25 Ac. <br />Average cost for seedbed preparation = $16.50/Ac. <br />Cost Calculation = 2.25 Ac. x $16.50JAc. <br />MULCHING & ANCHORING <br />$ 562.35 <br />Area to be mulched and crimped = 2.25 Ac. <br />Average cost of mulching and crimping = $139.50/Ac. <br />Cost Calculation = 2.25 Ac. x $139.50/Ac. _ $313.88 <br />• Area to be netted = 0.51 Ac. <br />Average cost of netting and tacking = $487.20/Ac. <br />Cost Calculation = 0.51 Ac. x $487.20/Ac. _ $248.47 <br />SEEDING AND PLANTING $ 300.34 <br />Total Area = 2.76 Ac. <br />Average cost for broadcast seeding = $108.82/Ac. <br />Cost Calculation = 2.76 Ac. x $108.82/Ac. <br />TOTAL MINE NUh16ER 2 PORTAL AREA RECLAMATION COST $ 5,227.47 <br />• <br /> <br />