Laserfiche WebLink
• TOPSOIL HANDLING - RULE 2.05.3(5) <br />As stated on page 2.05-24 in the Bear permit revision, topsoil will be <br />removed from those areas to be affected by surface relocation. Because <br />of past disturbances, topsoil will not be removed in all areas. The <br />areas of past disturbance are shown on the Soils Map (Map 4). The <br />Division's concern regarding salvage depths and volumes of topsoil are <br />discussed under the Soil Resource section of this adequacy response. <br />n <br />LJ <br />• <br />-39- <br />