Laserfiche WebLink
• No major new disturbance will occur on the existing portal bench for the <br />old Clark Mine. Bear Coal Company plans to merely rehabilitate the <br />bench so that future operations can be carried out with efficiency and <br />safety. Details of geotechnical analytical work currently being <br />undertaken for the bench area are found later in this report under the <br />Backfilling and Grading Requirements. The portal bench" will not be <br />extended in either direction to accommodate additional portal entries. <br />• <br />C~ <br />-37- <br />