Laserfiche WebLink
• The construction of the highway will still have an impact on the area to <br />be reclaimed by Bear Coal Company around the tipple and loadout area. <br />Therefore, in this area, Bear Coal Company plans to remove all of its <br />facilities and structures. After the Colorado Highway Department <br />completes construction of the highway, areas disturbed by the Highway <br />Department which will include the tipple and loadout area of Bear Coal <br />Company, will be reseeded by the Highway Department. <br />All areas to be reclaimed, particularly the face-up bench areas, haul <br />road and facilities area, will be ripped or scarified before applying <br />soil to relieve compaction and allow for root penetration as well as <br />eliminating slippage surfaces between the soil materials. A detailed <br />description of the actual reclamation procedures are set forth in the <br />Reclamation Plan. <br />• <br />• <br />-a- <br />