<br /> <br />These structures would not be constructed until the pit has been completely mined out in about 12 <br />years. With the help of Mr. Miller, we are in the process of looking at other alternatives to the <br />structures and presenting them to the Service and the Corps. We have some time to look at other <br />alternatives to the structures before they aze needed. However, in the event that no alternative can <br />be reached with the Service, we feel that Utey can be designed to withstand a t00 year flood event. <br />We will agree to have an engineered designed of the structures prior to their construction. We <br />would prefer not to spend the money for the design and the addition bond cost at this for <br />something that may never be built. <br />Enclosed is a receipt from the Mesa County Clerk for placing these adequacy issue on file. <br />If you need additional information please contact me. <br />Sincerely, <br /><~d~/~ <br />Edward J. Settle <br />