• <br />Attachment G <br />Permanent Postmine Features <br />I.0 Introduction <br />The Hayden Gulch Mine is an inactive surface coal mine that has undergone reclamation and <br />closure. All reclamation and revegetation activities at the mine have occurred in accordance with <br />Rule 2.05.4 and the approved reclamation plan. This attachment describes the permanent <br />postmine features that wiil be left on the landscape following final bond release. The following <br />sections summarize information found in the Consolidation Volume (dated August 1995) of the <br />permit application package (PAP) that was approved by the Colorado Division of Minecals and <br />Geology (CDMG) via technical revision No. 63 (TR-63). <br />2.0 Postmine Topography and Drainage <br />Proposed postmine topography and permanent drainage channel designs were approved by the <br />Mined Land Reclamation Division (MRLD -the precursor to the CDMG) as part of TR-51 and <br />TR-52. The as-built postmine topography was approved by the CDMG in conjunction with SL- <br />01, the Phase I bond release for the former mine pit area (NERD, Hayden Gulch, C-80-003 <br />Phase I Bond Release Final Notification, April 12, 1988). MLRD staff conducted a field <br />inspection in October 1987 and verified that slope gradients and drainage control had been <br />established in accordance with the approved reclamation plan and Rules 4.05.4, 4.09 and 4.14. <br />Certified as-built topography maps and cross-sectional profile maps were submitted to MLRD as <br />part of the Phase I bond release process. The approved postmine topography and permanent <br />drainage channels are shown on Drawing No. 2, Rev. 4 (Dated August, 1995), Reclamation <br />Sequence and Drainage Map, which is part of the Consolidation Volume (dated August 1996). <br />The Consolidation Volume was added to the PAP via TR-63. <br />3.0 Postmine Roads <br />All haul roads, access road and light use roads constructed for the mining operations were <br />removed and reclaimed in accordance with the postmining topography design approved via TR- <br />51. The only postmine roads are ranch roads that were present before mine development, trails <br />used to facilitate reclamation monitoring and maintenance, and tracks which connect the existing <br />ranch roads to the property access points. The postmine roads were included on the As-Built <br />Postmining Topography Map (dated Mazch, 1988) included in the SL-Ol bond release application <br />package; they are also shown on Drawing G-1, Permanent Postmine Features. <br />4.0 PermanentImpaundments <br />Two permanent impoundments (Pond 003 and Pond HG-8) were also incorporated into the final <br />reclamation design through several technical revisions that addressed the requirements of Rule <br />4.05.9. The impoundments are compatible with the postmining land uses of livestock grazing and <br />wildlife habitat in that they will provide permanent water sources for both livestock and wildlife. <br />MR-17 G.I Revised 12/05 <br />