Laserfiche WebLink
During Mining and hauling activities at the site, silt fences (if used) ditches (where present) will <br />be inspected for excessive sediment buildup that may infringe on the freeboazd. If such excessive sediment <br />buildup occurs, the sediment will be removed, as necessary. The stability of silt fences will be inspected <br />for proper anchorage at the base, for verticality of the fence supports and for fabric tears or rips. <br />Appropriate repairs will be made as necessary if significant problems aze noted. Inspections, testing, and <br />preventive maintenance will be performed on all site equipment and operational systems. This program will <br />aim toward prevention of failures by adjustment, repair or replacement of site equipment and /or structwes. <br />All excavating and hauling equipment will be regularly inspected and maintained. <br />The administrators for [he SWMP at this site will be Mr. Jack Corson, President of J. & D. Sand and <br />Gravel, and a designated contract operator employee. They will lie responsible for the development, <br />implementation, maintenance and revision of this SWMP. <br />