My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100453
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:10 PM
Creation date
11/24/2007 7:05:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007058
IBM Index Class Name
Permit File
Doc Date
8/21/2007
Doc Name
New Application
From
Timothy Scanlon
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 Other Controls <br />This section discusses other measwes to control pollutants in stormwater discharges such as <br />measwes to limit off-site tracking of sedimenu and other possible waste materials. Also included aze <br />general plans for construction waste and debris disposal and "good housekeeping/operation and <br />maintenance techniques" to reduce the potential for wastes coming in contact with stormwater. <br />Structwal BMPs will be utilized to minimize the potential release of stormwater runoff and <br />sediments from haul roads and mine pit areas. The mining operation will adhere to "good housekeeping <br />procedures to maintain a relatively clean area so that the site will have less potential for stormwater <br />contamination. Such procedures may include the following: controlling drips and leaks from equipment <br />and machinery, regular removal of trash/garbage and construction debris from the site, using proper clean- <br />up techniques for accidental spills, storing materials properly at the site and minimizing the amount of <br />materials stored, properly identifying and marking storage locations and refuse disposal locations, and <br />properly maintaining portable toilet facilities. <br />6.0 Inspection and Maintenance <br />This section provides a description of the procedwes [o inspect and maintain the vegetation, <br />erosion and sediment control measwes and other BMPs identified in this construction SWMP. In <br />accordance with the permit requirements, the entire stormwater management system will be inspected <br />every 14 days dwing mining activities and after any significant precipitation or snowmelCevent that causes <br />significant erosion. The BMPs will be maintained in good and effective operating condition during mining <br />activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.