Laserfiche WebLink
• A detailed estimate of the reclamation costs associated with the Fish Creek Tipple is found on Pages 2.05-28 <br />through 2.05-33 of Volume VIII, Fish Creek Tipple/I.oadout Appendix. Other bond calculations can be found in <br />Appendix A, Volume I-B. <br />(cl Allan for backfilling, soil stabilizine, compactine, and gradine, with postminina contour maps and <br />appropriate cross-sections that are typical and representative of the anticipated character of the final surface <br />configuration of the pmposcd permit area, in accordance with 4.14. for stream channel reconstnictiat in accordance <br />with 4.05.4, and for road removal or modification in accordance with 4.03.. <br />RESPONSE <br />Portal Area <br />The rough grading of the spoils at the portal area shall be accomplished by pushing the old spoil into the pit. <br />Dozers will be utilized to cover and rough grade the refuse area with spoil material. The material storage yard site <br />shall be restored by pushing the fill portion of the yard back into the cut area as shown on cross-sections B-B and <br />C-C on Map 25, Surface Area Cross-Sections. The access/haulroad shall be regraded by pushing the fill portions <br />into the cut areas. The spoil material will be compacted, graded and stabilized by the equipment used to place the <br />spoil materials. Map 31, Post Mining Topography, and cross-sections AA, B-B, D-D, E-E, F-F, G-G, H-H and Y-1 <br />on Map 25, Surface Area Cross Sections, show the final surface configurations in detail. The upland divisions are <br />shown on Map 25, cross-section HH/YY. The design for these channels is located in exhibit 8-R, <br />Grading operations shall be conducted to reinstate the approximate original contour and to avoid the creation of <br />long uninterrupted slopes. Since there are no steep slopes in the proposed permit area, cut and fill terraces will not <br />be installed. Grading will result in an undulating topography, thereby increasing moisture infiltration, reducing <br />runoff potential, and minimizing erosion. Topsoil will be distributed as shown on Map 29, Reclamation. <br />• Portal Slooe Heatine System <br />Upon completion of mining, the slope heating system will be dismantled and the small building will be removed. <br />The concrete pad will remain in place and will be buried during reclamation of the portal area. <br /> <br />~~~xg~~•d;~~ APR 2 4 2000 <br />Permit Renewal No. 3 2.05-99 4/1/99 <br />