My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100282
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:04 PM
Creation date
11/24/2007 6:57:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The pumping of thickener underflow into the abandoned workings will not have an impact on the active <br />mine operations. The underground pipeline will be monitored/inspected as part of the <br />weekly mine inspections that are performed at TCC. The inspections will be conducted to determine if <br />there are any leaks or broken fittings in the line. <br />The permanent monitoring well for this activity is the 10 Right dewatering well which is utilized to pump <br />water from the gob area. The water level in the 10 Right sump is monitored from this location. The stratum <br />underlying the abandoned mine works includes mostly shale and siltstone for l0 feet below the coal seam. <br />The gradient of the proposed settling area ranges from 3.5 to 12 degrees toward the 10 right dewatering <br />borehole sump. <br />2.0.4 Reclamation Plan <br />(I) Each application shall contain a plan for reclamation of the lands within the proposed penni[ arcs, <br />showin~~ how the applicant will comply +vi[h environmental protection performance standards of [he rekulatury <br />oroeram. The clan shall include. at a minimum. all information reouired under the relevant sections of Rule 2. <br />(2) Each plan shall contain the followine information for the proposed permit area: <br />(a) A detailed timetable for the completion of each maior step in the reclamation Ulan: <br />RESPONSE <br />• A detailed timetable for the completion of each major step in the Foidel Creek Mine reclamation plan is <br />included as Table 52, Reclamation Time Table. Details concerning the Fish Creek Tipple Reclamation <br />Plan are found within Rule 2.05.4 of the Fish Creek Tipple Appendix, Volume VIII. <br />(h) A detailed estimate of [he cost of reclamation of the proposed operations required to be <br />covered by a performance bond ++•i[h supportinc calculations I'ur the estimates; <br />RESPONSE <br />The detailed estimate of reclamation costs of the proposed operations with supporting calculations follows. <br />Time has been rounded to the closest hour and costs have been rounded to the closest dollar. Please see <br />Appendix A, Volume 1-B, for all bond calculations for minor, technical, and permit revisions. <br />• <br />TR 01-39 2.05-98 09/17/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.