Notes/Descriptions <br />At the end of mining - 50~ of Phase 3 <br />1. Outside shoreline is not backfilled = 1,825 feet times slope. <br />Cross-sectional area of 331 square feet = 22,375 CY of fill. <br />2. 1,825 feet of shoreline at 37 feet wide and 0.66 feet depth = <br />16,510 CY <br />3. Re-distribute overburden and topsoil from three Phase 8 <br />stockpiles = 3,000 CY <br />4. Replace one foot of overburden on two acres = 3,225 CY <br />5. Replace 0.5 foot of topsoil on two acres = 1,613 CY <br />6. 5.5 acres of fill plus two acres of strip plus 1.5 acres of <br />shoreline plus one acre of Phase 8 stockpiles = 10 acres <br />MODERATE DISTURBANCE <br /> UNIT TOTAL <br />NO. ITEM QUANTITY U NITS PRICE PRICE <br /> <br />9. Scarify Plant Site 3 3.6 AC $725.00 $ 2,610 <br />10. Distribute topsoil on <br /> Plant Site 3 2900 CY $ 1.00 $ 2,900 <br />11. Scarify haul road 0.8 AC $725.00 $ 580 <br />12. Distribute topsoil on <br /> haul road 645 CY $ 1.00 $ 645 <br />13. Distribute topsoil on <br /> Phase 2 shoreline above <br /> water level 890 CY $ 1.00 $ 890 <br />14. Seed, fertilize, mulch 5.5 AC $500.00 $ 2,750 <br />15. Plant trees 10 EA $ 40.00 $ 400 <br />16. Plant shrubs 20 EA S 25.00 S 500 <br /> <br /> TOTAL $11,275 <br />~. L-2 <br />