Laserfiche WebLink
EXHIBIT L <br />RECLAMATION COSTS <br />As mentioned in Exhibit D, only a portion of the site is disturbed <br />at any time due to mining in phases and concurrent reclamation. In <br />fact, this mining plan is designed so materials will only be <br />handled once in the creation of backfilled slopes and land for <br />later residential development. <br />In order to calculate the reclamation costs at any given time, we <br />have selected the largest two mining phases, Phases 2 and 3, so the <br />disturbance will be maximized. <br />If an operator default occurs, the dewatering pumps will be turned <br />off and the pit will fill with groundwater. Therefore, any <br />disturbed ground below the final lake elevation is not included in <br />this cost estimate. <br />MAJOR DISTURBANCE <br /> UNIT TOTAL <br />NO. ITEM QUANTITY UNITS PRICE PRICE <br /> <br />1. Backfill Phase 3, <br />shoreline to 3:1 22,375 CY $ 1.00 $22,375 <br />2. Topsoil Phase 3, <br />shoreline 1,650 CY $ 1.00 $ 1,650 <br />3. Distribute Phase 8, top- <br />soil and overburden <br />stockpile to Phase 3 <br />fill area 3,000 CY $ 1.00 $ 3,000 <br />4. Replace overburden on <br /> Phase 4, strip 3,225 CY $ 1.00 $ 3,225 <br />5. Replace topsoil on <br /> Phase 4, strip 1,613 CY $ 1.00 $ 1,613 <br />6. Seed, fertilize, mulch 10 AC $500.00 $ 5,000 <br />7. Plant trees 10 EA $ 40.00 $ 400 <br />8. Plant shrubs 20 EA S 25.00 ~ 500 <br /> TOTAL $37,763 <br />L-1 <br />