Laserfiche WebLink
10/28/2002 <br />• <br />• <br />• <br />PR5 <br />WASTE DRUM DISPOSAL BACKUP <br />Reference: MEANS Building Construction Cost Data - 2002; Section No. 02110-300 XXXX <br />Pursuant to the SPCC Plan -maximum predicted 55 gallon drums of waste oil and grease on <br />site is 19 drums. <br />Pickup: <br />Solid: use MEANS XXXX = 1100 $200 /drum <br />Transport: <br />200 miles -use average cost: Minimum cost (MEANS XXXX = 1260) <br />Maximum cost (MEANS XXXX = 1270) <br />Average cost <br />Calculation of transportation cost per drum: <br />200 miles X $3.85/mile / 19 drums = <br />Disposal (Dumpsite charge): <br />Use average cost: Minimum cost (MEANS XXXX = 6000) <br />Maximum cost (MEANS XXXX = 6020) <br />Average cost <br />Calculation of disposal cost per drum: <br />55 Gal./drum X 1 cu.ft./7.48 Gal. X 70 Ib/cu. ft. X 1 ton/2000 lbs. X $250/ton = <br />Total Cost: <br />WASTBKUPWasle dams <br />Pickup Transport Disposal <br />$200 $33.16 $64.34 <br />$2.30 /mile <br />$4.00 /mile <br />$3.15 /mile <br />$33.16 (drum <br />$100 /ton <br />$400 /ton <br />$250 /ton <br />$64.34 /drum <br />$297.50 /drum <br />~~3e,Io <br />