Laserfiche WebLink
1o/2a/2oo2 <br />• PR-5 <br />INDUTRIAL WASTE POND CLEAN-UP AND REMOVAL BACKUP <br />Reference: MEANS Building Construction Cost Data - 2002; Section No. 02110-300 XXXX <br />Pickup: <br />Transport: <br />Solid: 15 Tons -use average cost: Minimum cost (MEANS XXXX = 1120) $150 /ton <br />Maximum cost (MEANS XXXX = 1130) $500 Iton <br />Average cost $325 /ton <br />Liquid: 12 Hours -use MEANS XXXX = 3110 <br />$100 /hour <br />Solid: 200 miles -use average cost: Minimum cost (MEANS XXXX = 1260) $2.30 /mile <br />Maximum cost (MEANS XXXX = 1270) $4.00 /mile <br />Average cost $3.15 /mile <br />Liquid: 200 miles -use MEANS XXXX =3400 $4.30 /mile <br />Disposal (Solid and Linuid): <br />18 Tons -use average cost: Minimum cost (MEANS XXXX = 6000) $100 /ton <br />• Maximum cost (MEANS XXXX = 6020) $400 Iton <br />Average cost $250 /ton <br />~J <br />WA578KUPbW. Waste Pmtl <br />~~30/0 3 <br />