My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100171
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:00 PM
Creation date
11/24/2007 6:51:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPLICATION AND ENTIRE PERMIT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• gullies caused by erosion, are on both sides of and within thirty feet of <br />the fence on the west side of the disturbed area. The fill will be <br />mounded 6" to 12" high to provide material to repair any settling that <br />occurs in the future. These areas were identified on the site visit <br />conducted during September, 1995. <br />All Phase I areas including the subsidence repair will be seeded with <br />the approved seed mix and seeding schedule. <br />Phase II includes the removal of the upper diversion ditch, D-3 and <br />D-4, the lower collection ditch, D-1 and D-2, and the sedimentation <br />pond after the reclaimed area is stabilized and vegetative cover has <br />been established. Approval from the Division will be obtained prior to <br />commencing reclamation of the facilities. <br />The estimated total volume of material that will be moved is 13,800 <br />bank cubic yards, with 8,500 bank cubic yards being moved in Phase <br />I and 5,300 bank cubic yards in Phase I1. The attached Table 1 <br />presents the mass balance for the regrading work and is based on the <br />current topographic map Exhibit 17 and cross sections, Exhibit 18, <br />Sheets 1-3, developed from the current topographic map and the <br />slope stability analysis done in the disturbed area. The Post Mining <br />• Topography is shown on Exhibit 19. <br />The following equipment is expected to be used to establish the post <br />mining topography: <br />Bulldozer D-6 or larger <br />Front End Loader <br />Hydraulic Excavator <br />The fill material will be placed in two foot lifts and compacted by <br />mobile equipment, i.e. either a bulldozer or front end loader. <br />(2) (D) Plan for redistribution of topsoil <br />(a) The only topsoil stored at the mine site is the soil recovered from the <br />sediment pond. The plan is to cover the pond site with 1-2 inches and <br />then use the excess soil to cover the site. <br />(2) (E) Plan for Revegetation <br />(a) Schedule for revegetation <br />i. Seeding time schedule, May 15 -June 15 <br />• 14 A. <br />#~ <br />lo~R5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.