Laserfiche WebLink
Page 2 of 2 <br /> <br />Listed is a table of the proiected reclamation costs for Phase C <br />ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT <br />NO. RATE <br /> RIP PIT FLOOR FOR 7.85 ACRE $150.00 <br /> COMPACTION $1,177.50 <br />2 SPREAD TOPSOIL 3' <br />7'85 <br />ACRE <br /> THICK ON SLOPES AND <br />PIT FLOOR 3166 CUBIC $1 50 $ 4,749.00 <br /> (AVG HAUL c 700 LF) YD <br />3 SEEDING 7.85 ACRE $500.00 $ 3,925.00 <br /> <br /> SUBTOTAL $ 9,851.50 <br /> ADD PROFIT & 10% $ 985.15 <br /> OVERHEAD <br /> TOTAL $10,836.65 <br />Listed is a table of the projected reclamation costs for Final Phase <br />Reclamation <br />ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT <br />NO. RATE <br /> RIP PIT FLOOR FOR 10,2$ ACRE $150.00 <br /> COMPACTION $1.542.00 <br />2 SPREAD TOPSOIL 3" 10.28 ACRE <br /> THICK ON SLOPES AND <br />PIT FLOOR 4146 CUBIC <br />$1.rjO <br />$ 6,219.00 <br /> (AVG HAUL < 700 LF) YD <br />3 SEEDING 10.28 ACRE $500.00 $ 5,140.00 <br /> <br /> SUBTOTAL $12, 901.00 <br /> ADD PROFIT & 10% $ 1,290.10 <br /> OVERHEAD <br /> TOTAL $14,191.10 <br />