My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100154
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:00 PM
Creation date
11/24/2007 6:51:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
Permit File
Doc Date
10/19/2001
Doc Name
PRELIMINARY ADEQUACY REVIEW LETTER
From
ASPHALT CONSTRUCTORS
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 1 of 2 <br />EXHIBIT L <br />RECLAMATION COSTS <br />These reclamation costs assume that all stockpiles are removed from <br />the pit floor. The side slopes are set at no steeper than 3H to 1 V during <br />the mining operation. Once the toe of the pit wall has reached its point <br />the slope is shaped accordingly. Please see the areas marked on the <br />reclamation cost map for a better understanding of the finished area. <br />Topsoil will only be required in area shown. The balance of the side <br />slopes will have had topsoil applied. <br />Listed is a table of the oroiected reclamation costs for Phase A <br />ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT <br />NO. RATE <br /> RIP PIT FLOOR FOR 1 1.00 ACRE $150.00 <br /> COMPACTION $1, 650.00 <br />2 SPREAD TOPSOIL 3" 16.05 ACRE <br /> THICK ON SLOPES AND <br />PIT FLOOR 4437 CUBIC <br />$1.50 <br />$ 6,655.50 <br /> (AVG HAUL < 700 LF) YD <br />3 SEEDING 11.00 ACRE $500.00 $ 5,500.00 <br /> <br /> SUBTOTAL $13,805.50 <br /> ADD PROFIT & 10% $1,380.50 <br /> OVERHEAD <br /> TOTAL $15,186.00 <br />Listed is a table of the projected reclamation costs for Phase B <br />ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT <br />NO. RATE <br /> RIP PIT FLOOR FOR 9 27 ACRE $150.00 <br /> COMPACTION $1, 390.50 <br />2 SPREAD TOPSOIL 3' 14.SO ACRE <br /> THICK ON SLOPES AND <br />PIT FLOOR 3739 CUBIC <br />$1.50 <br />$5, 607.00 <br /> (AVG HAUL < 700 LF) YD <br />3 SEEDING 9.27 ACRE $500.00 $ 4,635.00 <br /> <br /> SUBTOTAL $11,632.50 <br /> ADD PROFIT & 10% $1,163.25 <br /> OVERHEAD <br /> TOTAL $12,795.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.