Laserfiche WebLink
<br />drilling machine be employed. The seed mixture can be <br />referenced in subsection (d) of this exhibit. This will be dry land <br />seeding with the seedbed prepared by disk or harrow. Seeding <br />shalt be installed during the spring or fall. Irrigation is discouraged <br />because it promotes weed growth and no fertilizer shall be used <br />The pit access road will be maintained so that wildlife, livestock <br />and people will have access to the pit area. <br />There are no buildings that are or will ever be a conflict with <br />the affected lands. <br />The appropriate signs and markers will be placed accordingly. <br />d) All areas shall be seeded in accordance with the following seed <br />mixture and rates as recommended by the USDA Natural <br />Resources Conservation Service. <br />SPECIES <br />Western Wheatgrass <br />Crested Wheatgrass <br />Streambank Wheatgrass <br />Russian Wildrye <br />Indian Ricegrass <br />No mulch shall be applied <br />No trees or shrubs will be planted <br />RATE (LBS. Of PLS/AC) <br />2.00 <br />.75 <br />1.38 <br />.75 <br />.60 <br />There is no definite timetable at which this project will be finished. <br />The amount of material that is available could last many years <br />depending on local market conditions and projects that are <br />available to us. <br />e) i) As mining progresses, topsoil will be redistributed along 3H to 1V <br />side slopes. It could take 8 to 10 years to mine a complete <br />phase. Once a mined phase is completed reclamation will <br />begin. <br />Page 3 of 5 <br />