My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100154
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:00 PM
Creation date
11/24/2007 6:51:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
Permit File
Doc Date
10/19/2001
Doc Name
PRELIMINARY ADEQUACY REVIEW LETTER
From
ASPHALT CONSTRUCTORS
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />drilling machine be employed. The seed mixture can be <br />referenced in subsection (d) of this exhibit. This will be dry land <br />seeding with the seedbed prepared by disk or harrow. Seeding <br />shalt be installed during the spring or fall. Irrigation is discouraged <br />because it promotes weed growth and no fertilizer shall be used <br />The pit access road will be maintained so that wildlife, livestock <br />and people will have access to the pit area. <br />There are no buildings that are or will ever be a conflict with <br />the affected lands. <br />The appropriate signs and markers will be placed accordingly. <br />d) All areas shall be seeded in accordance with the following seed <br />mixture and rates as recommended by the USDA Natural <br />Resources Conservation Service. <br />SPECIES <br />Western Wheatgrass <br />Crested Wheatgrass <br />Streambank Wheatgrass <br />Russian Wildrye <br />Indian Ricegrass <br />No mulch shall be applied <br />No trees or shrubs will be planted <br />RATE (LBS. Of PLS/AC) <br />2.00 <br />.75 <br />1.38 <br />.75 <br />.60 <br />There is no definite timetable at which this project will be finished. <br />The amount of material that is available could last many years <br />depending on local market conditions and projects that are <br />available to us. <br />e) i) As mining progresses, topsoil will be redistributed along 3H to 1V <br />side slopes. It could take 8 to 10 years to mine a complete <br />phase. Once a mined phase is completed reclamation will <br />begin. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.