Laserfiche WebLink
<br />w~ B.nraxs Mme Page 3 <br />Exwsrr D <br />6.3.4(1)(c)(vi) Establishment method for each species of shrub and/or tree <br />White River National Forest suggests that grasses and shrubs "... ~ be fertilized with an <br />organic fertilizer, with applicable rates of 1,600 pounds per acre." [Emphasis added.] WRNF <br />further states that "The more palatable shrubs would have to be caged off until they are <br />stabilized, or a ...fertilizer with a bitter systemic taste may be used .... Other commercial <br />substances ...may also be used to reduce wildlife foraging during the establishment period. <br />The fertilizer or repellent would have to be approved by the Forest Service." <br />6.3.4(1)(d) Ponds, streams, roads, buildings, in any, to left after reclamation, Life of Mine <br />Avalanche Creek Mazble & Alabaster does not anticipate leaving anything after reclamation except <br />the existing pubhc road (FDR 310) as improved in accordance with 6.3.3(1)(e) and 6.3.3(1)(8). <br />6.3.4(1)(e) Reclamatiou of Waste Rock Dumps, Tailings Impoundments, Underground Mioe <br />Openings, Ditches, Sediment Control Facilities, Buildings, etc., Specified in Exhibit C <br />but Not Previously Addressed io 6.3.4(1) <br />Avalanche Creek Marble & Alabaster does not anticipate the construction of waste rock dumps or <br />tailings ponds. Underground openings will be sealed in accordance with apphcable DMG and MSH.4 <br />regulations in effect at the time of reclamation. <br />No ditches other than as currently exist along Forest Service roads are contemplated. ACMA will <br />not reclaim these existing ditches. <br />No sediment control structwes as contemplated in 6.3.3(1)(I) aze proposed. <br />All nuning equipment, buildings, tanks, etc. will be removed from the site. Equipment, buildings, <br />tanks, and so on will be used elsewhere or sold. Concrete pedestals for the block loading traveling <br />crane will be removed and disposed of either underground or in a public land fill. No other concrete <br />foundations are proposed. <br />6.3.4(1)0 Estimate of Actual Cost of Reclamation <br />Estimated maximum distwbance will occw upon completion of the expanded mine bench and after <br />topsoil removal and graveling of the affected part of the main yazd azea. <br />The azea distwbed at this point will be approximately 1.4 acres. <br />~~ <br />w Nh 19.199911 },,SPMI <br />