Laserfiche WebLink
PARTI <br />Paee No. 10 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORIIVG R]rQUIItEMENTS <br />2. Siormwater Management Plan (SWMP) (continued) <br />f) Emolovce Education <br />The permittee shall develop and implement employee education programs to inform personnel at all levels of <br />responsibility of the components and goals of the SWMP. Education should address topic such az spill response, <br />good housekeeping and material management practices. The perminee shall identify periodic dates for such <br />instruction. <br />3. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitations specified in <br />Pan I.B.1, the permi[[ee shall monitor al] effluent parameters at the following frequencies. <br />a) Active Mining Outfalls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly <br />TSS, mg/P Monthly <br />Total Iron, mg/P Monthly <br />Settleable Solids, mP/P Monthly <br />Oil and Grease, mg/P Weekly <br />pH, s.u. Weekl}' <br />Total Dissolved Solids, mg/P Quarterly <br />CO River Basin ONLY <br />Total Phosphorus (az P), mg/P Quarterly <br />Dillon Reservotr and Upper Bear Creek' <br />Drainages Otily <br />b) Post-Minine Outfalls <br />Instantaneous <br />or Continuous <br />Grab <br />Grab <br />Grab <br />Visual <br />In-situ <br />Grab <br />Grab <br />Parameter Measurement.Frequency Sample Type <br />Flow, MGD Monthly Instantaneous <br />or Continuous <br />Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Monthly Visual <br />pH, s.u. Monthly In-situ <br />Total Dissolved Solias, mg/P Quarterly Grab <br />CO River Basin ONLY <br />Total Pbosphorus (as P), me/P Quzrterly Grab <br />Dillon Reservoir and Upper Bear Creek' <br />. Drainages Only <br /> <br />See Part I-C. Cor Definitions <br /> <br /> <br /> <br />