Laserfiche WebLink
<br />i'Rowt ~ ~_ <br />AMERICAN <br />SODA, LLP <br />RECEIVED <br />Ed Cooley <br />Environmental Safety and <br />Health Manager <br />2717 County Road 215 <br />PorachuTe. CO 81635 <br />Friday, December 13, 2002 <br />o~7~U <br /> <br />DEC 162002 <br /> <br />Division of Minerals and Geology <br />ENV 144.02 <br />Mr. Paul Osborne <br />U.S. Environmental Protection Agency <br />Region VIII <br />Mai I Code 8P-W-GW <br />999 18'" Street, Suite 500 <br />Denver, Colorado 802022466 <br />Dear Paul: <br />bC . (V acr't ~ ; <br />g~lo~~~~~~n~ <br />~ Yt'~ 1%Cti~ 0~/; C Q <br />'W~Q~~g <br />Direct Line (970) 285-0407 <br />International Telephone +1 (970) 285-6500 <br />General Facsimile (970) 285-6393 <br />~Q ~po~r"l ~0~ <br />;n '~vvo Sd(~Z,~nK <br />American Soda has investigated the issues surrounding the imbalance of flows on <br />Well 20-36 EPA# C03858-04562 and Well 29-24 EPA# C03858-04572. <br />The flow imbalance in Well 29-24 was due to an inaccurate injection flow meter, This problem <br />has been corrected by replacing the meter. During the time the meter was out of range the <br />pressure monitoring of the well indicated that there was no indication of loss of product or <br />gain of liquid from any outside source. The imbalance indicated more production than <br />injection flow and the pressure in the cavity is sufficiently high that back flow from an external <br />source would be highly unlikely. This meter was changed out on November 8, 2002 and the <br />balance has averaged approximately 2qo since that time. American Soda has also performed <br />an online Mechanical Integrity Test on this well to verify Casing and Annulus integrity. The <br />positive fluid balance was due to an inaccurate flow measurement of the injection meter on <br />well 29-24. <br />The flow imbalance for Well 20-36 during the month of September, 2002 was due to a glitch in <br />the data recovery from our PI Server. Periods of time when the well was by passed and a <br />minimum flow was maintained in the surface well piping to protect from freezing was not <br />segregated from the operating data, creating an incorrect balance. A corrected section for <br />the September 2002 portion of the Quarterly Report will be provided. This was not reported as <br />a 15 % imbalance as required by the Commercial Mine Plan since the glitch did not occur in <br />the well field operations daily data but at a later time when the reports were being prepared. <br />We are currently scanning our entire data collection system and spread sheet calculations in <br />an effort to detect and eliminate any similar situations. Should we find other cases of this <br />occurrence we will notify the agencies and provide corrected documentation. An on line <br />Mechanical Integrity Test has been preformed on this well to assure integrity of the Casing and <br />Annulus, <br />