My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56421
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:50 PM
Creation date
11/23/2007 11:26:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
2/10/1983
Doc Name
BLUE RIBBON COAL CO STIPULATION RESPONSE DOCUMENT
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ -. <br />' Z~'~; blue <br />•_.~ ribbon <br />coal <br />compan~r <br />1 <br />(_. <br />blue ribbon coal company <br />p. o. box 58 <br />delta, Colorado 81416 <br />13031 874-7561 <br />January 10, 1983 <br />' P[r. Robert Little <br /> Colorado Mined Land Reclamation <br /> Department <br />' Department of Na~ural Resources <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br />' Re: Blue Ribbon Mi <br />e P <br />r <br />it N <br />C-047-81 <br /> n <br />e <br />m <br />o. <br />' Gentlemen: <br /> Blue Ribbon Coal Company is required to submit information <br /> pertaining to stipulations No. 1 and No. 2 by requirement of the <br />' CPII.RD findings document. <br /> Stipulation No. 1 requires field work and mapping related to <br /> the colluvial material along the haulroad cut. Rocky Mountain <br />' Geotechnical was contracted to do this work. Their report includ- <br /> ing maps is being submitted directly to your office no later than <br />' January 10, 1983. <br /> Stipulation No. 2 requires the protection of riparian vegetation <br /> adjacent to pond No. 1. The Blue Ribbon Coal Company will leave this <br />t habitat intact including related vegetation adjacent to pond No. 1 and <br /> the trees adjacent to this pond if this area is not needed for a <br /> buttress to ensure slope stability of the final slope backfill <br /> configuration. This final configuration will be determined and <br />' accompany the stipulation No. 3 response which is required 60 days <br /> after permit issuance. <br />' If you have questions, don't hesitate to call. <br /> Very truly yours, <br /> <br /> C~ <br /> MdIV1R E. Adam <br />' Chief Engineer - Delta Operations <br /> MEA:pas <br />1 <br /> cc: W. S. Tate <br /> T. J. Mitchell <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.