Laserfiche WebLink
There aze no coal processing wastes or mine development wastes on site, nor will any be <br />generated by current or anticipated activities. There were, and will be, some reclamation wastes <br />(Non-Coal Wastes) generated by demolition of facilities. These wastes were and may be placed <br />in the pits between the limits of five (5) feet above the local ground water table and four (4) feet <br />below Approximate Original Contour (AOC). (PAP, 2.05.4, pages 106 and 114) Flyash (a waste <br />generated off-site at a power plant in Golden) is permitted for placement in Pits A (completed) <br />and B. Flyash is placed five (5) feet above the re-established local ground water table, and <br />covered with 6 feet of overburden spoil and 2 feet of topsand (PAP, Sec 2.05.4, page 113). <br />3.3.6 Other Reclamation <br />All facilities at the site are currently scheduled for removal, with the exception of electrical lines <br />not owned by CEC, a dugout pond, and Sediment Pond 2 and associated diversion drainage <br />ditches. Facilities to be demolished include the office, shop and warehouse; equipment pazking <br />lot; sewage treatment facility; all roads; electrical distribution system (to the extent owned by <br />CEC); potable water system; explosive storage facilities, and monitoring wells. (PAP, Sec <br />2.05.3, page 106) <br />Pit highwalls will be graded into the pit backfill (PAP, Final Contour and Drainage Plan). <br />3.3.7 Water Rights and Usage <br />Two wells aze permitted on the site (PAP, Sec 2.03.10, page 31). <br />Permit Renewa104 Findings <br />30 August 2001 <br />Page 12 of 25 Pages <br />