Laserfiche WebLink
1.2. Refuse Areas <br />1.2.1. List refuse areas and their locations. <br />None. However, disposal of some demolition materials is proposed in the deeper cut azeas of the <br />site. <br />1.2.2. For each refuse area, list the status of reclamation (compaction, cover, topsoil, and <br />revegetation). <br />Not applicable. <br />1.3. Topsoil <br />1.3.1. How large is the area ahead of the active mining area where topsoil has been removed? <br />None. <br />1.3.2. List topsoil stockpiles and their location. <br />There are three topsoil (TS) piles. TS-1 is located at the faz west end of the permit area, on the <br />east side of Haulroad HRI. TS-1 does not appear in any photograph of this report. TS-2 is <br />located inside and close to the railroad loop, between the coal load-out hopper and the Rail Loop <br />Pond. TS-3 is located inside and close to the most western section of the railroad loop. <br />1.3.3. Placement of Topsoil <br />Topsoil replacement is recognized as a Phase II Bond Release activity. There has been no <br />reclamation work at the site. <br />1.3.4. Topsoil placement inspections <br />None <br />1.4. Revegetation <br />1.4.1. How much area ahead of the pit and topsoil removal areas has been brushed? <br />None. <br />1.4.2. Revegetated areas. <br />None. <br />Page 2 of 9 pages, 8/ 10/2007 <br />