My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56318
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:12 PM
Creation date
11/23/2007 11:21:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
8/17/2007
Doc Name
Letter Regarding Coal Bond Compliance Inspection
From
DRMS
To
Hydro-Environmental Solutions Inc
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2. Refuse Areas <br />1.2.1. List refuse areas and their locations. <br />None. However, disposal of some demolition materials is proposed in the deeper cut azeas of the <br />site. <br />1.2.2. For each refuse area, list the status of reclamation (compaction, cover, topsoil, and <br />revegetation). <br />Not applicable. <br />1.3. Topsoil <br />1.3.1. How large is the area ahead of the active mining area where topsoil has been removed? <br />None. <br />1.3.2. List topsoil stockpiles and their location. <br />There are three topsoil (TS) piles. TS-1 is located at the faz west end of the permit area, on the <br />east side of Haulroad HRI. TS-1 does not appear in any photograph of this report. TS-2 is <br />located inside and close to the railroad loop, between the coal load-out hopper and the Rail Loop <br />Pond. TS-3 is located inside and close to the most western section of the railroad loop. <br />1.3.3. Placement of Topsoil <br />Topsoil replacement is recognized as a Phase II Bond Release activity. There has been no <br />reclamation work at the site. <br />1.3.4. Topsoil placement inspections <br />None <br />1.4. Revegetation <br />1.4.1. How much area ahead of the pit and topsoil removal areas has been brushed? <br />None. <br />1.4.2. Revegetated areas. <br />None. <br />Page 2 of 9 pages, 8/ 10/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.