Laserfiche WebLink
Information in the table below is from Table 12.1-2 of Attachment 12-1 of Tab 12, PAP. <br />Reclamation cost estimate line items aze identified. See Attachment 23-1, PAP. <br />name dimensions com osition cost <br /> foundation floor structure estimate <br /> line item <br />Truck Dump 6,600 CF, floor concrete concrete steel 37 <br />Hopper 18'x27.5', <br />superstructure foundation <br /> 2.5'x91'x3.5' <br />Reclaim 12' concrete 37 <br />tunnel <br />Dump hopper 10'x115' CMP 37 <br />belt conveyor <br />tunnel <br />Dump hopper 147' steel 37 <br />belt conve or <br />Crusher 24'x28'x30' concrete concrete steel 37 <br />buildin <br />Crusher belt 210' concrete steel 37 <br />conve or <br />Conical stack 8'x65' steel 37 <br />tube <br />Stacker floor 44'x68.5', concrete concrete steel 37 <br />reclaim foundation <br />tunnel and 12"x225'xl6", <br />conve or conve or53.S <br />Stacker 10'x79' CMP 37 <br />reclaim <br />tunnel <br />Train loadout footing, concrete steel 37 <br />buildin 130'su ersturcture <br />Loadout belt 290' steel 37 <br />Powerhouses 14'x8'x10' concrete steel 37 <br />2 ea <br />Dust 12'xl6'x7' concrete steel 37 <br />suppression <br />pressure tank <br />buildin <br />Dust 12'x8'x7' concrete steel 37 <br />Suppression <br />system <br />Buildin <br />Water storage 14' dia x 25' concrete steel 37 <br />tank <br />Page 8 of 9 pages, 8/10/2007 <br />