Sec. 1 l: Lots 1, 2, 3, 4, 5, 6, 7, 8,
<br />Lot 9 North of the Centerline of the River, NW/4 SE/4 North of the
<br />Centerline of the River, N/2SW/4 North of the Centerline of the River,
<br />SW/4 SW/4 North of [he Centerline of the River
<br />Sec. 12: Lots 1, 2, 3, 4 and 5, 6, 7, and 8 North of the Centerline of the
<br />River, S/2 NW/4, SW/4 NE/4 and NW/4 SW/4 North of the Centerline of the
<br />River
<br />Sec. 17: NE/4NW/4, NW/4NE/4 North of the Centerline of the River and
<br />Town of Somerset
<br />Township 12 South, Range 91 West, 6th PM
<br />Sec. 34: Lot 15, 16
<br />Sec. 35: Lot 7, 14, l5, 16, 19, 20, 21, 22
<br />Sec. 36: Lot 5, 6, 7, 8, 11, 12, 13, 14, 15, 16, 17
<br />Township 13 South, Ranee 91 West, 6th PM
<br />Sec. 1: All Sec. 2: Lots 1, 2, 3, 4, S/2 NW/4, S/2 NE/4, SE/4, N/2SW/4
<br />Sec. 3: Lots 1, 2, 3, S/2 NE/4, N/2 SE/4
<br />Sec. 11: E/2NE/4
<br />Sec. 12: All
<br />Sec. 13: Lotl, N/2NE/4
<br />The existing Sanborn Creek Mine permit azea contains 9,047 acres, of which 3,553 acres are on
<br />private land, and 5,494 acres are on federal land.
<br />The mine site is located north of the town of Somerset, Colorado. The North Fork of the
<br />Gunnison River is located south of the town of Somerset. The mine permit areas are located on
<br />the U.S. Geological Survey 7.5 minute Bowie and Somerset Quadrangle maps.
<br />
<br />
|