Laserfiche WebLink
<br />Memo to PCPC <br />Re: SUP No. 1997-009 <br />10/12/99 <br />Page 2 <br />~~ <br />4. The applicant shall notify the beneficiaries of any utility easements prior to <br />commencement of any mining activity adjacent to an easement. Applicants shall file a <br />copy of this notice with the Department of Planning and Development. <br />5. The applicant will need to maintain valid access easements for this site if the haul route <br />is to cross property not owned by the applicant prior to connecting with the County <br />maintained portion of 36'" Lane. <br />6. The applicant's haul trucks shall not operate on 36'" Lane from 7:30 a.m. to 8:30 a.m., <br />and 2:45 p.m. to 3:45 p.m., on days in which school is in session. <br />.,,` <br />7. The applicant shall either pave 36'" Lane from the ehd oftFie preseritly paved section of <br />36'" Lane to the south side of the access to the special use permit site or: <br />The applicant shall contract with a licensed, bonded contractor for the applications of <br />magnesium chloride (a dust palliative) at least twice per year to the portion of 36`" Lane <br />from the edge of the paved section to the south side of the access into the special use <br />permit site. Additional applications of magnesium chloride may be required if deemed <br />necessary by the County Engineer. The rate of application and strength of solution will <br />be specified by Public: Works. All costs associated with the application of magnesium <br />chloride shall be borne by the applicant. <br />8. The applicant shall be: responsible for repairing damage to that portion of 36'" Lane, <br />between the applicants' access point and Business Route Highway 50, that occurs <br />duriny the applicants' hauling period. <br />9. Upon completion of all mining related activities under this SUP or every six (6) months <br />(during mining activity only), whichever is less, the applicant shall paint a hash mark <br />perpendicular to the centerline of 36'" Lane at tenth (0.10) of a mile intervals from <br />Business Route Highway 50 to the applicants' point of access to 36'" Lane. Adjacent to <br />the hash marks, the ;applicants shall paint the appropriate tenth (0.10) of a mile reading <br />beginning at the Highway 50 south right-of-way line (e:g: 0.1 at4he first hash mark, 0.2 at <br />the second, and so cn). The Pueblo County Public Works Department shall then <br />videotape the road, at the applicants' expense, from Business Route Highway 50 to the <br />applicants' point of access to 36'" Lane. The videotape shall be produced in standard <br />VHS format in such .a way and at such a speed that any defects in the roadway surface <br />shall be easily discernible for viewers. This will be the established baseline for all repair <br />requirements. <br />10. The applicants shall repair in good workmanlike manner any damage to 36'" Lane <br />caused by its trucks as determined by the Pueblo County Public Works Department. <br />11. Repairs shall include, but not be limited to, patching potholes and restoring the road to a <br />condition as good as, or bei.ter than existed prior to commencement of the applicants' <br />operations under the Special Use Permit. The video log will be used by Public Works to <br />determine the extent of repairs required. <br />