My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56020
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:58 PM
Creation date
11/23/2007 11:02:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
10/30/1992
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review <br />Eastside Coal Company <br />Introduction <br />This document presents the results of the Division's Midterm Review of <br />Eastside Coal Company's Eastside Mine. This Midterm Review was <br />conducted to fulfill the requirements of Rules 2.08.3, 2.06.2(10), <br />2.06.3(4), 2.06.5(3), 2.06.7(5), and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit <br />issued, prior to its midterm (2-1/2 years). Based on this review, for <br />good cause shown, the Division may require reasonable revisions or <br />modifications of the permit provisions to ensure compliance with the <br />Act and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental <br />practices, mountaintop removal variances, variances from approximate <br />original contour (AOC), and variances from contemporaneous reclamation, <br />respectively, be reviewed by the Division where applicable during the <br />Midterm Review. The Eastside Mine does not have any experimental <br />practices or any variances from mountaintop removal, AOC, or from <br />contemporaneous reclamation. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond <br />and the terms of acceptance of the bond every 2 1/2 years. <br />This midterm review consisted of a detailed review of the Eastside Mine <br />permit application and findings document to identify any items that may <br />have been overlooked during the initial review. The Division also <br />reviewed all subsequent revisions and stipulation responses to ensure <br />that all permit commitments and conditions were being followed. <br />Hydrologic monitoring data was reviewed in conjunction with the review <br />of the application to assess the adequacy of the monitoring plan and <br />discussion of hydrologic impacts. Problems and observations form past <br />inspection reports were also considered. <br />This review contains six sections: <br />Section I - History <br />Section II - Revisions to the Permit <br />Section III - Status of Stipulations <br />Section IV - Permit Variances <br />Section V - Decision to Require Revisions <br />Section VI - Bonding Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.