Laserfiche WebLink
STIPULATION NO. 7 <br />THE APPLICANT SHALL SUBMIT A HYDROLOGIC MONITORING REPORT FOR THE DORCHESTER <br />NO. 1 MINE. THE MONITORING REPORT SHALL INCLUDE A SUMMARY AND ANALYSIS OF <br />DATA COLLECTED TO DATE, INCLUDING: 1) WATER USED IN THE MINING OPERATION, 2) <br />MINE WATER DISCHARGES TO RECEIVING STREAMS (QUANTITY AND QUALITY), 3) MINE <br />WATER INFLOWS (ANNUAL MINE INFLOW STUDY), 4) STREAM FLOWS AND QUALITY, AND 5) <br />IMPACTS TO THE QUALITY AND QUANTITY OF BEDROCK AQUIFERS. THE MONITORING <br />REPORT SHOULD UPDATE THE STATEMENT OF PROBABLE HYDROLOGIC CONSEQUENCES AND <br />INCLUDE A DESCRIPTION OF MITIGATIVE MEASURES TAKEN TO MINIMIZE DISTURBANCE TO <br />TF~ PREVAILING HYDROLOGIC BALANCE AND A PLAN FOR MODIFYING THE MONITORING PLAN <br />IF NEEDED. THE MONITORING REPORT SHALL BE ADEQUATE TO PLAN FOR MODIFICATION <br />OF SURFACE OR UNDERGROUND MINING ACTIVITIES, IF NECESSARY, TO MINIMIZE <br />DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. THE REPORT IS DUE AUGUST 1, <br />1985. <br />Statue - Terminated <br />This stipulation was terminated with the approval of Permit Renewal 1, which <br />incorporated the submittal of an Annual Hydrology Report into Exhibit 25 of <br />the permit application. <br />STIPULATION NO. 8 <br />THE APPLICANT SHALL SUBMIT A PLAN FOR MONITORING THE SUCCESS OF REVEGETATION <br />WITHIN 180 DAYS OF PERMIT ISSUANCE. <br />Statue - In Compliance, Terminated <br />On January 29, 1985, a plan for monitoring revegetation was submitted and on <br />February 26, 1985 the plan was accepted. This was incorporated into the new <br />permit application with the approval of Permit Renewal 1, November 27, 1989. <br />STIPULATION NO. 9 <br />THE OPERATOR SHALL POST AND MAINTAIN "STEEP SLOPE CAUTION SIGNS" ALONG THE <br />ACCESS ROAD TO THE REFUSE DUMP. TWO MONTHS PRIOR TO ABANDONMENT AND <br />RECLAMATION OF THE ACCESS ROAD, THE OPERATOR SHALL SUBMIT APPROPRIATE <br />GEOTECHNICAL STABILITY ANALYSIS TO DEMONSTRATE COMPLIANCE WITH THE STABILITY <br />REQUIREMENTS OF RULES 4.03.2(3)(c)(i) OR (d)(viii); OR IN THE ALTERNATIVE, THE <br />OPERATOR SHALL SUBMIT A PROPOSED RECLAIMED CONFIGURATION WITH APPROPRIATE <br />STABILITY ANALYSES TO DEMONSTRATE CONFORMANCE WITH THE REQUIREMENTS OF RULE <br />4.03.2(7). <br />Status - In compliance, Future Submittals <br />The sign ie posted. Stability analyses will be performed prior to reclamation <br />of the site. <br />STIPULATION NO. 10 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO MONITOR THE LOCATION AND <br />ORIENTATION OF THE THOMPSON RANCH STRUCTURES. THE APPLICANT SHALL SURVEY <br />THESE STRUCTURES ON A QUARTERLY BASIS. <br />Statue - Terminated <br />The revised permit application included a eubaidence monitoring plan that <br />incorporated quarterly monitoring of the Thompson Ranch structures. This <br />monitoring has been performed in accordance with the plan to date. <br />