Laserfiche WebLink
11/04/2003 10:18 FAS 970 240 5387 BLM/USFS 1~j009 <br />l <br />i <br />(REVISID 3~-9-95) <br />CDNTROLLF9 34RFAC$ 4S8 STIPULATION <br />3LOP8S 40-60$ <br />Serial No. C-1362 <br />Sur£aee eceupaaey or use ie subject to the_ following special operatlag <br />eoastraiats. <br />Special interdiacipliaazy team analysis and mitigation plans deeailiag <br />construetioa sad mitigation teehaiques will be required oa areas w%th <br />elopes ranging from 40-60~. (The iaterdiscipliaary team could include <br />engineering, soil scientist, hydrologist, landscape architect, reclamation <br />specialist sad coal mining engineer.) <br />Mitigation may include, but is sot limieed to, use of erosion control <br />cloths, mate, geoweb soil support materials, lifting and saving local <br />rsative vegetation in chunks of sod to~be later placed over, disturbed areas, <br />zeseedixsg disturbed. basks with stabilizing seed 'mix, use of chemical <br />stabilizers, tackifiars and blankets and careful design of surface water <br />flow. ~ ' <br />Oa iaade, deeoribed below: <br />Portions of See. Z7, 28, 29, (3o-BLM), 32,, 33, 34, T13S, R9aw, ~aad•portioas <br />of See.3, 4,. 9, 10, T145,•&9ow; 6tli PM with scopes 40-6p3 as generally <br />delineated oa the attaehed~map prepared by Michael IC. Piard dated 12-19-96. <br />The map is•for planning purposes only. Ice the event of say conflict between . <br />writtea.clausas of this stipulation sad the~map, the stipulation c~.ausea <br />shall control."All National_ ~'oresL System and Bureau 'of Land Management <br />lands w3thia the leasehold which~bave .elopes rsagiag from 4o-6ot falls <br />under jurisdiction of this stipulation. <br />.For tlza purpose of; ., ., <br />Minimizing potential for soil loss, mass land movemea_,' i'evegetatien. <br />failure and unacceptable visual impairment.' <br />It may become necessary for a waiver, exception oz~modifieation (wsM) to <br />. this stipulation for the operator/lessee to •use the surface is the area <br />~.~ covered by this stipulation to allow for the recovery bf Llse coal reserve. <br />wEM's to this stipulation will be considered only at the time operations <br />are proposed, and will be subject to the Forest Land and Resource <br />Management Plan is effect at the .time of consideration, sad will be subject <br />to applicable regulatory sad eaviroamental cotrtplianee' requirements. <br />' Granting of a WEM is a Forest Serviee~ discretionary action which the <br />operator should not. routinely expect. The Forest Servioe reserves the <br />right to impose other stipulations in the same area of this leasehold if a, <br />w&M is granted. ~ , <br />Aay ehaagea to this stipulation will be made is accordance with the load use <br />place. sad/or the regulatory provisions for, such ehaagas. (For guidance oa.~the <br />u9e aP this etipulatioa, see 8L1! Manual 1624 sad 3400. or FS Manual 165,0 and <br />2620.) ~ ~ , <br />. Coal-C&U 40-60 2/95 <br />