Laserfiche WebLink
<br />Upon completion of the raise boring, a 8 foot diameter <br />steel lining will be placed in the open hole with cranes <br />and a lowering device. The casing will be slotted to <br />prevent water accumulation and have a wall thickness of <br />.25 inches. When the casing is in place, the annulus <br />will be grouted at the bottom collar and filled with pea <br />gravel to within 10 feet of the surface. A permanent <br />concrete collar around the steel lining will complete the <br />shaft construction.e <br />The air s:veeps (as required) at the shaft bottom will be <br />developed by continuous miner during the shaft bottcm <br />development and the excavation for the raise head <br />assembly. <br />77.1900 (A)(4) Elevations and Dimensions <br />Diameter (excavation) - 9 feet 3 inches <br />Diameter (lined) - 8 feet <br />Collar E12vation - 7354 feet msl <br />Depth to Coalbed - 505 feet . <br />77.1900 (A)(5) Location and Elevation of Coalbed <br />Coalbed - Maxwell <br />Elevation (top of seam) - 6748 feet msl <br />Thickness - 6 feet <br />77.1900 (A)(6) General Characteristics of Strata <br />Strata - The shaft will be developed through strata <br />composed of interbedded sandstones, mudstones; shales, <br />and coal beds (see attached lithology log). <br />77.1900 (A)(7) Type of Equipment to b2 Used <br />The drilling, reaming, casing and collar construction. <br />will be performed by Dynatec Mining Contractors Inc. <br />The drilling rig to be used is a Ingersoll-Rand RBM-7SP. <br />The steel liner will be set in place by contract cranes. <br />The grouQing and backfilling will be performed frcm the <br />surface.' <br />- y '. Revised 1/26/91 <br />`'. Revised 1/26/91 <br />PIW-1 Exhaust Shaft <br />6 A~PRUVED G1~S ~ N ~7~~ C~ ~ °.q "I <br />