My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55803
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:46 PM
Creation date
11/23/2007 10:49:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
12/26/1991
Doc Name
EDNA MINE PN C-80-001 REQUEST FOR APPROVAL OF 1992 1996 PERMIT TERM LIABILITY AMOUNT & ITS PROPOSED
From
PITTSBURG & MIDWAY COAL MINING CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6. FACILITY/ROAD/STOCKPILE AREA GRADING <br />Site Specific Details <br />• Areas will be ripped on 3 foot centers to a depth of three feet using a D-9-L dozer with a <br />ripper shank. <br />• Ripped areas will be graded using a D-9-L dozer with a U-blade, to reestablish correct <br />drainage patterns. <br />• Volume of material to ripped/acre = 9,840 yds3. <br />ni <br />a. Production Rate <br />Ripping <br />Rate of Passes =Pass Length/Pass Speed+ Turn Around Time <br />_ [(209 feet + 60 feet min) + 0.25 min.] <br />= 3.7 min./pass or 13.5 passes/hr. <br />Area/Pass =Pass Length x Pass \'Jidth <br />=209ftx3ft <br />= 70 passes/acre. <br />Time/Area =Pass Area + Pass Speed <br />= 70 passes/acre + 13.5 passes/hr <br />= 5.18 hr/acre. <br />Grading <br />Time/Area = 1.0 acres hour. <br />Actual Production Rate =Ripping Rate + Grading Rate <br />= 5.18 hours/acre + 1.0 hours/acre <br />= 6.18 hours/acre. <br />b. Hourly Labor/Equipment Costs <br />Costs for a D-9-L with a ripper shank or a U blade <br />Labor Equipment <br />wave rental _ooeratianal Total <br />$17.95 $102.96 $43.79 $164.70 <br />c. Unit Cost to Grade Facility/Roads <br />_ (Labor Rate + Equipment Rate) x Production Rate <br />= 6.18 hours/acre x $164.70/hr <br />_ $1,017.91/acre <br />December 12, 1991 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.