Laserfiche WebLink
-5- <br />STIPULATION N0. 15 <br />UTILIZING RESULTS OF THE GEOTECHNICAL STABILITY ANALYSIS REQUIRED <br />BY THE PREVIOUS STIPULATION, THE PERMITTEE WILL IN CONSULTATION <br />WITH THE DIVISION DEVELOP AN ACCEPTABLE PLAN FOR INTERIM <br />STABILIZATION OF THE SLOPE ABOVE THE WEST PORTALS. THE PLAN WILL <br />BE SUBMITTED WITHIN 6 MONTHS OF PERMIT ISSUANCE AND WILL BE <br />IMPLEMENTED WITHIN 8 MONTHS OF PERMIT ISSUANCE. <br />STIPULATION N0. 16 <br />THE DIVISION DIRECTS WESTERN SLOPE CARBON TO DEVELOP A PLAN FOR THE <br />PROPER DISPOSAL OF THE COAL PROCESSING WASTE MATERIAL CURRENTLY <br />EXISTING WITHIN THE SURFACE FACILITIES AREA AT THE EAST HAWK'S NEST <br />MINE, INCLUDING, BUT NOT LIMITED TO, THE PORTAL BENCH AND WASH <br />PLANT EMBANKMENTS. THIS PLAN SHALL DEMONSTRATE CONFORMANCE WITH <br />THE REQUIREMENTS OF RULES 4.06.2, 4.10, 4.11, 4.14, AND 4.27, AS <br />APPROPRIATE. THIS PLAN SHALL BE SUBMITTED TO THE DIVISION FOR <br />REVIEW AND APPROVAL WITHIN b MONTHS FOLLOWING ISSUANCE OF THIS <br />PERMIT. <br />STIPULATION N0. 17 <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE THE PERMITTEE SHALL SUBMIT TO <br />THE DIVISION FOR INCORPORATION INTO THE APPLICATON, AN ACCEPTABLE <br />PLAN FOR PLACEMENT AND STORAGE OF COMBUSTIBLE WASTE, OIL AND <br />GREASE, ABANDONED MINING EQUIPMENT NND OTHER NON-COAL WASTE. THE <br />PLAN WILL ADDRESS THE ENVIRONMENTAL PROTECTION MEASURES REQUIRED BY <br />RULE 4.11.4. STORAGE AREAS WILL BE INDICATED ON A MAP OF THE <br />SURFACE FACILITIES AREA. <br />STIPULATION N0. 18 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE DIVISION DIRECTS WESTERN <br />SLOPE CARBON TO PREPARE AND SUBMIT TO THE DIVISION APPROPRIATE <br />STABILITY ANALYSES OF ANY CUT SLOPE OR FILL SLOPE ADJOINING <br />ROADWAYS AT THE HAWK'S NEST MINES WHICH EXCEED THE MAXIMUM <br />REGULATORY SLOPE LIMITS CONTAINED WITHIN RULE 4.03. THIS ANALYSIS <br />IS NOT NECESSARY FOR THE STATE HIGHWAY ROADCUTS. THE OPERATOR MAY <br />SUBMIT REPRESENTATIVE "WORST-CASE" ANALYSES, IF GEOTECHNICAL <br />ANALYSIS DEMONSTRATES THAT THE CUT SLOPE AND EMBANKMENT SLOPE <br />SITUATIONS PURPORTED TO BE REPRESENTED BY THESE HNALYSES ARE <br />NNALOGOUS. <br />STIPULATION NO. 19 <br />WITHIN 2 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO <br />THE DIVISION AN ACCEPTABLE PLAN FOR SNOW REMOVAL AND DISPOSAL, TO <br />INSURE THAT SNOW AND ROAD SURFACE MATERIAL IS DISPOSED OF IN AN <br />APPROPRIATE AREA AND DOES NOT INTERFERE WITH SURFACE DRAINAGE. <br />