My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55781
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:45 PM
Creation date
11/23/2007 10:47:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
3/14/1983
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />STIPULATION NO. 9 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL IDENTIFY AN <br />ACCEPTABLE REFERENCE AREA AS DESCRIBED IN THE APPLICATION OR SUBMIT <br />TO THE DIVISION AN ACCEPTABLE ALTERNATIVE REVEGETATION SUCCESS <br />STANDARD FOR THE HOTCHKISS COAL PROCESSING WASTE DISPOSAL SITE. <br />STIPULATION N0. 10 <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />INFORMATION TO THE DIVISION VERIFYING THAT EXISTING POWER LINES AND <br />TRANSMISSION FACILITIES ARE CONSTRUCTED AS REQUIRED BY RULE 4.18 TO <br />INSURE THE PROTECTION OF LARGE RAPTORS. <br />STIPULATION N0. 11 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE WILL SUBMIT TO <br />THE DIVISION A PLAN FUR REGULATING PUBLIC ACCESS ALONG STATE <br />HIGHWNY 133 DURING BLASTING IN ORDER TU PROTECT THE PUBLIC. NO <br />BLASTING SHALL OCCUR UNTIL AN ACCEPTABLE PLAN HAS BEEN SUBMITTED TO <br />AND APPROVED BY THE DIVISION. <br />STIPULATION NO. 12 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, AND PRIOR TO ROCK TUNNEL <br />DEVELOPMENT, THE PERMITTEE WILL SUBMIT TU THE DIVISION REVISED MINE <br />PLAN MAPS AND MINING PROJECTIONS WHICH ACCURATELY REFLECT THE <br />CURRENT STATUS OF MINING AT HAWK'S NEST AND THE PROJECTED EXTENT <br />AND SEQUENCE OF MINING DURING THE FIVE YEAR PERMIT TERM. <br />STIPULATION N0. 13 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE RECLAMATION TIME FRAMES <br />SPECIFIED IN THE REFUSE DISPOSAL PLANS WILL BE REVISED TO <br />ACCURATELY REFLECT THE REVISED COAL WASTE AND ROL'K WASTE VOLUME <br />PROJECTIONS. <br />STIPULATION NO. 14 <br />THE DIVISION DIRECTS WESTERN SLOPE CARBON TO PREPARE A THOROUGH <br />GEOTECHNICAL STABILITY ANALYSIS OF THE PROPOSED RECLAIMED <br />APPROXIMATE ORIGINAL CONTOUR L'ONFIGURATIONS FOR THE EAST PORTAL AND <br />WEST PORTAL DISTURBANCE AREAS. THIS ANALYSIS SHALL BE COMPLETED <br />AND SUBMITTED TO THE DIVISION FOR REVIEW WITHIN 6 MONTHS FOLLOWING <br />ISSUANCE OF THE PERMIT. THE GOAL OF THIS ANALYSIS SHALL BE TU <br />DETERMINE CONFORMANCE WITH THE REQUIREMENTS OF RULE 4.27.3(3). <br />IN THE EVENT THAT THIS ANALYSIS DETERMINES THE CURRENT PROPOSED <br />RECLAIMED CONFIGURATION TO ACHIEVE A STATIC SLOPE SAFETY FACTOR OF <br />LESS THAN THE REQUIRED 1.3, THE APPLICANT SHALL AMEND ITS <br />RECLAMATION PLAN TO CONTAIN BACKFILLED CONFIGURATIONS WHICH WILL <br />ACHIEVE THE REQUIRED STATIC SLOPE SAFETY FACTOR. THE AMENDED <br />RECLAMATION PLAN AND A SUPPORTIVE STABILITY ANALYSIS SHALL BE <br />SUBMITTED TU THE DIVISION WITHIN ONE YEAR FOLLOWING ISSUANCE OF THE <br />PERMIT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.